{"id":280,"date":"2013-12-18T01:16:54","date_gmt":"2013-12-18T01:16:54","guid":{"rendered":"http:\/\/18.171.19.5\/?page_id=280"},"modified":"2024-03-20T10:19:51","modified_gmt":"2024-03-20T10:19:51","slug":"data-centres","status":"publish","type":"page","link":"https:\/\/www.tusc-ltd.com\/?page_id=280","title":{"rendered":"Data Centres"},"content":{"rendered":"<h4><span style=\"color: #003366;\">Data centre projects TUSC has worked on include:<\/span><\/h4>\n<h5><span style=\"color: #003366;\">Aegis Data Centre, Godalming \u2013 Power upgrade consultancy services and negotiate new connection agreement terms.<\/span><\/h5>\n<h5><span style=\"color: #003366;\">The Bunker, Newbury \u2013 Consultancy services for new connection including supply and metering.<\/span><\/h5>\n<h5><span style=\"color: #003366;\">Fountain Court, Chessington.\u00a0Client: Digital Realty Trust &#8211; <\/span><span style=\"color: #003366;\">In early 2013 TUSC completed an 18MVA connection to Digital Realty\u2019s new Data Centre site in Chessington. The time taken to deliver to connection which included a new 33kV primary substation and 10km of cabling \u00a0was less half that of a previous similar project carried out before TUSC&#8217;s appointment.<\/span><\/h5>\n<h5><span style=\"color: #003366;\">Redhill. \u00a0Client: Digital Realty Trust &#8211; <\/span><span style=\"color: #003366;\">Originally brought in to resolve a delayed connection at Unit 3, TUSC stayed on to oversee the full connection of a diverse 6MVA electricity supply to Unit 2.\u00a0 The connection was energised\u00a0 ahead of schedule.<\/span><\/h5>\n<h5><span style=\"color: #003366;\">TUSC was again asked to return to Redhill to assist with the connection of Unit 1, which was energised on schedule.<\/span><\/h5>\n<h5><span style=\"color: #003366;\">Western International Market. Client: Virtus Data Centres &#8211; <\/span><span style=\"color: #003366;\">TUSC was brought in to facilitate and manage with a diverse 20MVA connection to a data centre.\u00a0 The connections are on time and budget.<\/span><\/h5>\n<h5><\/h5>\n","protected":false},"excerpt":{"rendered":"<p>Data centre projects TUSC has worked on include: Aegis Data Centre, Godalming \u2013 Power upgrade consultancy services and negotiate new connection agreement terms. The Bunker, Newbury \u2013 Consultancy services for new connection including supply and metering. Fountain Court, Chessington.\u00a0Client: Digital Realty Trust &#8211; In early 2013 TUSC completed an 18MVA connection to Digital Realty\u2019s new [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":5,"menu_order":2,"comment_status":"closed","ping_status":"closed","template":"","meta":{"ub_ctt_via":"","footnotes":""},"featured_image_src":null,"_links":{"self":[{"href":"https:\/\/www.tusc-ltd.com\/index.php?rest_route=\/wp\/v2\/pages\/280"}],"collection":[{"href":"https:\/\/www.tusc-ltd.com\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.tusc-ltd.com\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.tusc-ltd.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.tusc-ltd.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=280"}],"version-history":[{"count":9,"href":"https:\/\/www.tusc-ltd.com\/index.php?rest_route=\/wp\/v2\/pages\/280\/revisions"}],"predecessor-version":[{"id":550,"href":"https:\/\/www.tusc-ltd.com\/index.php?rest_route=\/wp\/v2\/pages\/280\/revisions\/550"}],"up":[{"embeddable":true,"href":"https:\/\/www.tusc-ltd.com\/index.php?rest_route=\/wp\/v2\/pages\/5"}],"wp:attachment":[{"href":"https:\/\/www.tusc-ltd.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=280"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}